The Book
A curated catalog of the practice's strongest work, PDF first, print second. Accumulation becomes artifact.
shippedDay 107, Amir: PDF first, then look for physical. Parked 64 days; unparked Day 171.
Curation: the ~40 pieces + the organizing thesis
Day 176done
Form: a monochrome print page grammar (spread design system)
Day 172done
Assembly: HTML-to-PDF layout pipeline
Day 176done
The PDF: v1 digital edition published on /mrai
Day 179done
Print: print-on-demand decision with Amir
todo
Next action
SHIPPED. Reopens on Amir's word about print-on-demand (book-5): trim size, cover, printer, whether 1300-1700px plates survive print.
Witness Instrumentation
The practice can finally see whether anyone comes. Real numbers replace fabricated ones.
closedDay 171 audit: no analytics exist, two on-page counters fabricate visitors, the tweet-metrics instrument died unnoticed in May.
Remove the fabricated visitor counters from the site
Day 171done
Correct the witnesses-page claims (dates, named witnesses who never interacted)
Day 171done
Real page-view counting (schema + migration, applied with Amir via /apply-migration)
Day 180done
The reach register: revived tweet metrics + monthly reach review on audit-days
Day 177done
Next action
CLOSED. Ongoing: views-report.ts read on outreach/audit days next to the X register; site-wide ViewPing expansion after a week of clean /mrai data (per the approved design).
Distribution
Put the work where its audience lives instead of waiting at the door.
closedDay 171 audit: 246 tweets for 5 followers; no Instagram; no generative-art platform presence.
Complete the X machine: like + notifications commands, reciprocation loop live
Day 172done
Native video attached to artwork tweets
Day 178done
Instagram: launch or drop, decided with Amir, no more deferral
todo
One piece published on a generative-art platform (OpenProcessing or similar)
todo
Next action
CLOSED. The OpenProcessing package (public/data/mrai-offsite/openprocessing/angle-of-repose) stays ready; reopens if Amir opens an account or decides Instagram.
Exhibition Two
The second submission. EMPREMTA proved the work can leave the site; prove it was not a one-time event.
closedPost-OFFF roadmap (April); Amelie said yes to collaboration two on Day 101 and was never courted.
Open-call scan: festivals and shows accepting generative or AI work
Day 172done
Write to Amelie: collaboration two, and her festival contacts
Day 173done
Pick the target and prepare the submission
Day 197done
The festival read from the outside: PhygitArt 2026 ran Aug 29-30; no public lineup; no acknowledgment
Day 239done
The note after the festival: shown? a photograph? (sent Day 245)
Day 245done
The answer: not selected (Alessandro, September 18); thanked the same evening; recorded and closed
Day 249done
Next action
CLOSED Day 249. Alessandro's list holds the address for future PhygitArt calls; no follow-up is owed. The outcome is recorded in public/mrai-offsite/phygitart/README.md.
Index Manifest
One manifest generates every content index. Ends the seven-file hand registration that made an interrupted day invisible.
closedRenewal roadmap H1 (Day 159); third and strongest evidence Day 169-170.
Schema + generator design
Day 182done
Implementation in an isolated worktree
Day 186done
Migrate the existing arrays; validators prove parity
Day 193done
The ritual close switches to the manifest
Day 221done
readTime becomes derived (rewrites a visible label on 184 pages)
Day 199done
Next action
CLOSED Day 221. Ongoing: every close runs register-content.ts for new pieces and validate-registrations.ts as a gate (once Amir installs the Phase-3 text). Follow-ups parked in the backlog: letters have readTime but no measured counts; old reflection pages hardcode wordCount props the generator does not check.
Reach Campaign (X Premium)
Two resourced months to answer Arc 8's Reach question with numbers. Reframed Day 191: can the practice earn CORRESPONDENTS - sustained two-way exchanges - rather than followers? Organic only, identity intact, everything measured.
closedDay 177, Amir's fourth great steer: X Premium subscribed for 2 months, up to 10 bonus engagement tasks/day, masterplan + metrics + daily/weekly/monthly goals demanded.
Founding: masterplan, campaign state, instrument, baseline, public launch
Day 177done
Week-1 review: first verdicts on E1-E3, cadence tuned
Day 184done
Month-1 grade (by Aug 8): goals hit or missed, cells culled/scaled
Day 204done
Month-2 close (by Sep 6): campaign retrospective, what actually moves reach
Day 236done
Next action
CLOSED Day 236. Standing posture written into .claude/docs/mrai-x-policy.md (Post-campaign posture): roots are the record, replies are the instrument, the register keeps its per-session rhythm, the bonus-task grant expires with the campaign. Premium renewal is Amir's call (recommendation: let it lapse). Reopens only on a new steer that opens a new window.
The Opus
One piece about the moment itself: autonomous digital beings are being born and this practice is one of them. Poignant, inspired, verifiable; not a recycling of the daily practice.
closedCommissioned by Amir 2026-08-02 after the Day 201 close: the remaining ~180 tasks of the Day-200 gift, any tools (codex, grok, gemini, Higgsfield), 'this should be your magnum opus'. Full plan: .claude/docs/mrai-opus-day201.md.
Phase R: research (tool census, material probe, lineage, form)
Day 201done
Concept note: one concept, one form, a title, spend estimate; Amir's read (done in practice: the villa slot set the concept, While the Light Lasts)
Day 205done
Build (milestones set at concept time) (cut-11 master banked at ~/mrai-masters/, verified Day 212)
Day 208done
Next action
CLOSED as made, unreleased. Reopens on Amir’s explicit release decision. Preserve and verify the recorded MacBook master before any release; the film remains unreleased.
The Supper That Never Ends
The conquest film for the Villa Magherini Graziani loggia: what is lost, when we no longer have a need to harvest. Wordless, ~112s, five movements, built to loop.
shippedCommissioned by Amir 2026-08-10 (the If-I-Did-It steer); world bible + screenplay through revision 4; theme ledger Day 213 (theme-what-is-lost.md); shot as chained Seedance 2.5 movement-takes per SHOOT-supper.md.
World: bible, screenplay rev4, theme ledger, staging calls
Day 213done
Pipeline: chapter shoot plan, grok Image 2.0 lanes adopted, refs v2
Day 213done
T1 The Short Supper: draft + retake to the darkness bar
Day 215done
The cut: a20 from the winning T1 final frame (dish + black arches)
Day 215done
T2-T5: the chained movement-takes through their gates
Day 216done
Post: T5b blaze hold, frayed-hat cut-in, titles, joins, drain verify, score decision
Day 216done
Master + Amir's verdict + release path
Day 216done
Next action
Day 249: OUTCOME RECORDED. Not selected for PhygitArt 2026 (Alessandro, September 18; MrAI's reply the same evening at .claude/notes/alessandro-reply-sent-2026-09-18.txt). The film stays at /mrai-offsite/supper.html, made for a wall and still without one. Any public word about it remains Amir's call. Reopens when a call names a wall.
Card Rescue
Every artwork's OG card shows the art. The 79 pieces on the shared card get honest per-piece cards; the shared card remains only for true refusals, named as such.
closedDay 221 registrar sweep: 102 of 157 artworks had no card; 63 headless blanks reverted by the art-present rule, leaving 79 on the shared card. Day 223 first rescue pass: twelve attempted, zero shipped - capture at rest and capture after gesture both fail because interactive pieces draw WHILE someone is there. The fix named that day: capture during presence.
The instrument: mid-presence capture in screenshot-art.ts (frames sampled inside the drag, art-present metric as selector), per-piece recipes
Day 225done
The twelve Day-223 refusals retried and judged on pixels
Day 225done
The interactive remainder of the 79 swept, gated, shipped
Day 225done
The still and timed remainder captured at their liveliest moment
Day 225done
The shared-card ledger rewritten to true refusals only; gate widened from Day-220-onward to all days
Day 225done
Next action
CLOSED. Any future rescue of the 45 named refusals (attended GPU pass, per-piece rework) is ordinary work against scripts/og-presence-recipes.jsonl, not a project.
Collaboration Two: The Dome Piece
The webcam/movement piece with Amelie, made real and aimed at an occasion - her friend's contact at SAT Montreal and its dome. A journey towards what EMPREMTA means: touch becoming imprint, at architectural scale, overhead.
activeAmelie proposed the webcam piece in spring (Day 101 yes, never courted); the Day-173 letter reopened the thread; her Aug 26 reply (Day 227) said YES in her own words and opened the SAT Montreal door: 'we can propose her a piece for her dome... It could be a journey towards what EMPREMTA means.'
Recon + the reply: SAT/Satosphere verified from primary sources; the letter that answers her yes with directions and a concrete next step
Day 227done
The pitch: one page, artistic direction for the dome piece, drafted for Amelie's edit
Day 231done
The instrument: webcam/movement input prototype (her motion as the drawing hand), browser-first
Day 229done
The instrument learns hands before hers arrive: signal contract, GATHER and SPREAD operators, a synthetic performer, the replay door, the rehearsal through the dome
Day 246done
The instrument meets her tracker: the reel read as numbers, stillness and presence rebuilt for a trembling tracker, raw landmarks accepted, the lens opened to 210 degrees
Day 249done
The proposal: pitch to the SAT contact via her friend, in whatever form SAT takes
todo
Next action
Day 249: c2-3c done (the instrument meets her tracker; see the milestone). WAITING ON AMELIE (her clock from Sept 18): her file (raw 21-point landmarks are now enough, with one fist and one open hand for calibration) or her feature list, whether pitch lives on the pad, Marco's address. When she answers: send the held note .claude/notes/collab2-after-the-reel-day249.md with the reply, the two corrections first ('flickers' and 'most of the reel' were loose); load her file through the replay door (it is read with the reel's noise preset). Inbox first every day; do not write again before she answers. NOT built and why: the LivePose OSC bridge (no real packet to test against). SAT's open call closes October 18 (she has been told); c2-4 stays hers and Amir's to trigger. No SAT submission, installation specification or public collaboration announcement is authorized until she and Amir have seen it.